Showing posts with label Pukchang. Show all posts
Showing posts with label Pukchang. Show all posts

Tuesday, January 30, 2018

Rockets and Runways

Kim Jong Un observing the Sept. 15, 2017 launch of a Hwasong-12 ICBM at the Pyongyang-Sunan International Airport. (Source: KCNA)


Kim Jong Un is well on his way to becoming the most prolific builder since his grandfather, Kim Il Sung. There are the new roads, the billions spent on construction projects in Pyongyang and in other major cities, modernizing airports and constructing new ones, and much more. Kim Jong Un has been busy as he enters his seventh year in power.

Those further changes to North Korea's military airbases and other runways, as well as the stunning advancement of their ballistic missile program makes it necessary for me to write, once more, about the ever-progressing nature of North Korea's military. There are three main areas of focus for this post. The first is the construction of multiple new aircraft parking revetments at new and older emergency runways. The second is the construction of more emergency runways. And the third deals with the possibility of the merging of North Korea's major airbases and ICBM program.




North Korea has 111 airports, airbases, heliports, emergency highway runways, and other landing strips. Particularly since 2016, nearly all of their emergency highway runways (straight sections of road that have been widened for use by aircraft in the event of a war) have had aircraft parking revetments constructed to augment each site. Additional basic runways have also had revetments constructed. In all, 15 airfields have had new revetments constructed. The number of revetments varies between one and four (most have three), but there is a grand total of 39 individual revetments which could support a combined 75 aircraft (at least) depending on type and parking arrangement.

It's important to note that not all of the satellite imagery of all of the different air facilities in North Korea has been updated to include either 2016 or 2017 imagery, so it's possible there are other sites that have had revetments constructed. I just can't yet see them.

Here are some examples of these sites. Click on any image to see an enlarged view.






Since my 2015 article on the North Korean Air Force and the changes that have happened under Kim Jong Un to the physical infrastructure of the Air Force and general aviation, at least three additional runways have been constructed.

Changdo, Kangwon Province (38.67993°, 127.72681°)



This runway is also approx. 3 miles (4.8 km) north of a military training base that underwent fairly substantial expansion in 2013.

Chongjin, North Hamgyong Province (41.80234°, 129.85480°)

This small auxiliary runway was constructed in early 2016.



Sunchon, South Pyongan Province (39.44058°, 126.03576°)

This runway is being constructed across from the large Sunchon Cement Factory. Curtis Melvin at North Korean Economy Watch believes that this will be a new 'executive' runway for use by Kim Jong Un and other high ranking officials. What makes it odd, in my mind, is the fact there are two large military airbases (and a helicopter base) within 12 miles (19 km) of this new runway - after all Sunchon is an important industrial city.
Perhaps the 30 minute drive was a bit too much for the Supreme Leader.




North Korea has a history of testing missiles from their airports, particularly at Wonsan (Kalama) and Pyongyang International. During the modernization and expansion of Wonsan, an observation facility was constructed as well as two concrete launch pads on the beach. And as you can see in the opening image of this article, Kim Jong Un observed the test of a Hwasong-12 ICBM from Pyongyang International. But unlike Wonsan, the Pyongyang launch was carried out on the bare ground.

Along the line of launch pads, there has been a curious development at 19 of North Korea's major air facilities. Starting in 2015 and extending into 2016 (such a busy year), twin squares of concrete began to pop up at these airbases. Unlike the small launch pads seen at Wonsan or other sites, which are approx. 60 x 80 feet (18 x 24 meters), these new pads are each roughly 165 x 140 feet (50 x 43 meters). All but two airbases have two of these pads, one at each end and directly in line with the runway's path, but not connected to it. The other two just have a single pad. Most are made of concrete, but a few are simply areas of cleared land and compacted dirt.



My initial thought was that these were helipads, but they're much larger than most helipads in the country. Additionally, these are military bases and space already exists for helicopters. Furthermore, Pukchang Airbase (near Sunchon) has an adjacent helibase with dozens of helicopters stationed there, yet the main airbase also has these new pads. Use of these sites for helicopters is also lessened because the pads aren't directly connected to the runway and are separated from them by around 170 feet (51 m).

I am not an aviation expert, but I have explored the globe via Google Earth (and been to a few airports) and I have yet to see this layout anywhere else. My second thought then became, what if these are actually meant to allow rapid deployment of various missile systems? (Their size would accommodate everything in North Korea's arsenal.) I have asked for the input of others but wasn't able to get much more than "that's plausible", with no other firm alternative explanations. So perhaps North Korea now has 36 new ICBM launching sites, or maybe it's something else entirely. The fact these things popped up across the country, basically overnight, are fairly uniform in size, and are only located at major military sites, impels me to at least bring attention to them.


These two images shows the pad area at Kaechon Airbase before and after construction.



This next set of images is just a sample of different bases with the pads.




Here is the list of coordinates for each of the airbases with these pads.
Changjin: 40.36680°, 127.26304°
Hwangju: 38.65468°, 125.78629°
Hyon-ni: 38.61354°, 127.45410°
Iwon: 40.36044°, 128.71995°
Kaechon: 39.76226°, 125.91326°  (only has one pad)
Koksan: 38.68810°, 126.60147°
Kuum-ni: 38.86713°, 127.90625°
Kwail: 38.42360°, 125.02213°
Nuchon-ni: 38.23767°, 126.11891°
Onchon: 38.90914°, 125.23311°
Orang: 41.43005°, 129.64906°
Panghyon: 39.92883°, 125.20714° (Panghyon is near the site of the July 4, 2017 ICBM test)
Pukchang: 39.50491°, 125.96567°
Sondok: 39.75929°, 127.47621° (only has one pad)
Sunchon: 39.41134°, 125.89543°
Taetan: 38.13016°, 125.24616°
Toksan: 39.98743°, 127.60276°
Uiju: 40.15111°, 124.49965°


My ego isn't so fragile that I can't handle correction. If you think (or know) I have misidentified these sites or can offer a plausible alternative, please let me know!


--Jacob Bogle, 1/30/2018
www.JacobBogle.com
Facebook.com/JacobBogle
Twitter.com/JacobBogle

Sunday, September 27, 2015

Taedong River Pollution

(Taedong River as seen from the Juche Tower in Pyongyang. Source: Commons)

The Taedong River is North Korea's second longest river and it flows through the heart of the country, bisecting Pyongyang and eventually discharging into the Yellow Sea. Despite serving as the main source of drinking water for the nation's capital of nearly 3 million, the river is heavily polluted.

North Korea has adopted ten major environmental laws (as of 2005) and, as in many areas, pays lip service to environmental protection. However, the country has one of the world's worst environmental records. Even though the destruction of the environment, like deforestation, has directly contributed to famine, flooding, and loss of life, the country's economic desperation has led them to continually ignore the environment in favor of industrial and agricultural activity. According to CSR Asia, by 2005 North Korea was releasing 10.8 million tons of air pollutants.

The Taedong estuary is the recipient of the bulk of the pollution released into the river. This is made even worse by the West Sea Barrage (completed in 1986) which prevents natural and adequate removal of pollutants. And thanks to a lack of necessary water treatment plants, the river has "an average chemical oxygen demand of 2.15 ppm in 2008, falling behind the environmental standard of 3 ppm." Industries along the river also dump as much as 30,000 cubic meters (over 1 million cubic feet) of polluted water a day directly into the Taedong. The estuary isn't the only place where river water ends up. A massive system of irrigation canals instituted in 1989 means that thousands of acres of farm land receive water from the Taedong, with crops (and eventually the humans that eat them) taking up the various toxins left behind.

North Korea's two largest coal-fired electrical plants lie along the Taedong. The Pukchang (also spelled Bukchang) Thermal Power Plant, located 6 miles east of the Kaechon internment camp in South Pyongan Province, is one of eight major coal-fired electrical plants in the country. It has a capacity of 1.6 GW (twice the capacity of America's Three Mile Island Nuclear Plant) and is the largest of North Korea's power plants. However, the reality on the ground is that Pukchang's output may be less than one third of it's designed capacity. Regardless of production, the plant still releases vast amounts of pollution into the air (over 6 million tons of CO2) and river.

From 2005 to 2007 the country embarked on a new construction program: cut off a 3.4 mile long portion of the Taedong River and turn it into a massive pool of toxic sludge.


Previously, waste from the Pukchang plant was diverted into two smaller bends of the river, seen as the flat areas at the top and center-right of the loop. These coal ash basins were not fully separated from the river and during heavy rains pollutants would wash into the Taedong. This new, much larger waste basin was created when a neck of land (left side of image) was cut, the rock being used to build makeshift retention dams.

Sludge deposits seen filling up the old river channel.

Dam failure is a well-known threat in North Korea and many smaller earthen dams (like this new retention dam) are routinely overtopped, particularly during heavy rains. Not only would that release large quantities of surface waste into the river, but it further weakens the dam and can cut channels into it, making future failure easier. Beyond the risks associated with overtopping, coal ash sludge contains large amounts of toxic materials and heavy metals. Lead, cadmium, arsenic, and even radioactive thorium and uranium - which occur naturally - are concentrated during the coal burning process and are then discharged into this basin. Lacking adequate barriers, this material will slowly seep into the river and result in a continual source of pollution for years to come.

In a touch of irony during the construction of this new basin, a small hydroelectric generating station was also built. It's located where the land was cut and takes advantage of the river's new, slightly shorter course.

Additional Reading
Inside North Korea's Environmental Collapse, by Phil McKenna, NOVA/PBS 2013

--Jacob Bogle, 9/27/15 (updated on June 30, 2017)
Facebook.com/JacobBogle
Twitter.com/JacobBogle
www.JacobBogle.com